Wānaka.
Home of
South Island
Aviation.

A general-aviation centre of excellence, built the way the community asked for it.

Concept deck · October 2026 · Prepared for Andrew Gray
Tititea / Mt Aspiring from the air. Concept only, not a QLDC, QAC or Egis document
Two years of listening · 2024 → 2026

The community already said yes.

91%say the success of local aviation businesses matters to Wānaka
82%support investment in hangars and buildings
85%support utilities (power, fibre, water) for aviation business growth
86%want the airport to be the Upper Clutha's emergency-response hub

"Centre of Aviation Excellence" came up unprompted in Phase 1 and went into Egis's recommendations.

Egis, Wānaka Airport Future Review (Feb 2026), Figs 3-29 to 3-31, Table 3-7; Phase 2 n≈300 per question
It also drew the red lines

GA-scale.
Not a second
Queenstown.

72%opposed larger domestic services (Scenario 4)
87%opposed international services (Scenario 5)
UnanimousCouncil adopted Scenario 3 (GA plus limited ≤30-seat turboprop), 19 March 2026

This hub sits entirely inside Scenario 3: no runway extension, no airspace change, no jets, no terminal spend.

Egis §3.2.4–3.2.5; QLDC signed minutes, 19 Mar 2026
Why Wānaka
"Its uncontrolled airspace and mountainous terrain make it a world-class location for mountain and rescue flight training."Egis · Wānaka Airport Future Review, §3.3.2
~250jobs at the airport today
11+aviation businesses: helicopter MRO, avionics, restoration, schools, scenic, skydive
42.6kaircraft movements in 2024, mostly training and private
Class Gopen, uncontrolled airspace, which the community wants kept that way
QLDC covering report ¶9; Egis; QAC SOI FY26–28; Egis §3.5.1.1
The one thing holding it back

Hangar space.

  • Users told Egis today's hangars are "inadequate and a limiting factor on their activities".
  • "Planes are moving to other airports in the region as hangars are more available or most cost effective."
  • An Australian kit-aircraft manufacturer considered manufacturing and servicing at Wānaka but didn't come, "in part due to hangar space and confidence in the long-term direction of the airport."
Egis §3.3.2.1, §3.3.2.2, §6.1.6. Photo: Wānaka Airport GA apron, Alex Proimos (CC BY 2.0)
The vision

One precinct. Six pillars.

01

Hangars & buildings

Modern multi-use hangars on long ground leases, paid for by private capital. Some built ready for civil defence.

02

Maintenance centre

Part 145 MRO for piston, turboprop and helicopter GA, plus avionics and heritage restoration. Built with today's operators.

03

Training academy

Aircraft-engineering training from Level 3 through to a Part 66 licence, with apprenticeships on real aircraft.

04

Mountain flying

Growing the existing flight schools: mountain, rescue and backcountry proficiency.

05

Concierge front door

One point of contact for based and visiting aircraft. Quality, not volume.

06

Backcountry & resilience

A gateway for SAR, conservation and medical flights, a hub for the Upper Clutha's emergencies, and future-aircraft events.

Pillars map to Egis Complementary Options 1 & 2 (RESEARCH.md §5)
Pillar 05 · Concierge / FBO

One call.
Everything handled.

  • Arrival handling, parking and fuel coordination (Avgas + Jet A1 already on the apron)
  • Short- and long-term hangarage booking across the precinct
  • Maintenance slots booked with local Part 145 shops
  • Crew transport, lodging and local partners
  • Mountain-weather and backcountry briefings from local pilots
  • Warbirds, research and Flying Doctor visitor support
A service layer only: no apron, runway or terminal expansion assumed
Pillar 01 · Hangar & building precinct

Private capital.
Council land.

Insulated, serviced hangars on long ground leases: hangar-for-sale, hangar-for-lease and shared community hangars. Some are designed as civil-defence multi-use with back-up power. Phases are built only once anchor tenants have signed.

This is the same model that unlocked the Patey Aviation Business Park at Spanish Fork, Utah: a city-backed 50-year ground lease brought in private hangar and FBO investment.

82% support hangars86% support multi-use emergency hangars
Egis Fig 3-30, Table 3-8; Flying Mag 24 Jul 2023 (process analogy only). Photo: PA-18 Super Cub, Oren Rozen (CC BY-SA 3.0), illustrative
Pillar 02 · Maintenance, repair & restoration

The South's
GA workshop.

Line and base maintenance for piston, turboprop and helicopter GA. Avionics. Heritage and warbird restoration. A regional parts pool. All of it built with Wānaka's established shops, which today are short of room.

"…a general aviation maintenance centre of excellence."Airport users at Future Review user-group meetings (Egis §3.3.2.1)
WAUG vision: centre of excellence incl. "maintenance, repair and restoration" (Egis §3.5.2.2). Photo: illustrative, KamauxKamau (CC BY-SA 4.0)
Pillar 03 · Engineering training academy

A trade learned here.
Recognised across the Tasman.

WhereWhat a Wānaka-trained engineer can do
New ZealandNZ Certificate in Aeronautical Engineering (L3–4) → CAA Part 66 licence, trained with a certified Part 147 partner
AustraliaGain a CASA licence under the Trans-Tasman Mutual Recognition Act, plus an Australian administration exam
United StatesDocumented hours count toward the FAA A&P (14 CFR 65.77: 30 months' experience), then the FAA tests
CanadaPathway still being verified; no claim made yet

300+ engineers short nationally · about 100 formal training places a year · no known aeronautical engineering school south of Christchurch.

CAA NZ (TTMRA; Part 147); 14 CFR 65.77; AIANZ Budget 2026; NZ Herald. A licence isn't automatically valid everywhere; each regime has its own steps
Jobs for Upper Clutha young people
"I came from the North Island specifically to train at Wānaka because of the environment and the high level of expertise and reputation the school, airport and region have."Community respondent · Wānaka Airport Future Review (Egis, 2026)

A local apprenticeship pipeline. Not tourist accommodation. That answers the community's softer 47% support for "training facilities" directly.

Egis Fig 3-32 and "What the community said" panels. Photo: Matukituki Valley, Steve Collis (CC BY 2.0)
Pillars 04 + 06 · Backcountry, resilience, community

The Upper Clutha's
lifeline in the sky.

86%back the emergency-response hub and multi-use hangars with back-up power
78%back medical facilities and a permanent Flying Doctor presence
80%want a future-aircraft airshow alongside Warbirds

Mountain and rescue flight training, SAR and conservation access, a test ground for electric and future aircraft (70% support), and a base that stays useful if a fault-line event cuts off the valley.

Egis Tables 3-7 to 3-9, 3-14, 3-15. Photo: Warbirds over Wānaka 2014, Bernard Spragg (CC0)
The economic case

The strongest option
Egis appraised.

$18–28MNPV, Complementary Option 2 "Centre of Aviation Excellence"
4.6–11benefit–cost ratio
$3–5Mestimated capital cost
$0ratepayer capital assumed for buildings under this proposal

Private builders fund the hangars. Council keeps the land and earns open-book ground rent. The community gets skilled jobs, a training pipeline and resilience.

Egis Tables 4-11, 4-13, 4-15 (preliminary, capital costs only; text gives BCR 5.9–11.0). The "$0" is this proposal's commitment, not an Egis figure
Indicative precinct logic · location set by the Master Plan

Front door → workshop → classroom.

EXISTING RUNWAY · UNCHANGED TAXIWAY / APRON CONCIERGEarrival · fuel coord ·crew · briefings HANGAR ROWS · PHASEDprivate build · long ground leaseincl. civil-defence multi-use bay MRO CENTREPart 145 · avionics ·restoration · parts TRAINING ACADEMYPart 147 partner · L3–4 ·apprentices in the MRO Diagram only. Not to scale, not a site plan. Precinct location, size and utilities to be set in the 2027 Master Plan.
What we're asking of Council

Four decisions. No ratepayer capital.

Plan for it

Identify and protect a GA Centre of Aviation Excellence precinct (hangars, MRO, training) in the 2027 draft Master Plan.

Make it financeable

Agree in principle to long-tenure ground leases so private builders can finance quality hangars.

Stage the utilities

Programme power, fibre, water and wastewater for the precinct within the Master Plan's infrastructure staging.

Work in the open

A standing proponent briefing to WALC, open-book ground-rent principles, and early manawhenua engagement through Aukaha.

Aligned with covering report ¶16: Master Plan scope includes "infrastructure staging … opportunities for aviation innovation and training"
Our commitments · the next 12 months

Built with Wānaka, not at it.

No change to airspace or runway · no ratepayer capital for buildings · partnership with existing operators · local hiring and apprenticeship targets · nothing built until anchor tenants have signed.

Q4 2026Briefings for officers and WALC · roundtable with existing operators · introduction to Aukaha
Q1 2027Precinct concept · demand study · explore an MoU with a training partner
2027Precinct in the draft Master Plan → public consultation
Post-adoptionGround-lease EOI · Phase 1 hangars + MRO
QLDC 25 Sep 2026: draft Master Plan to Council in 2027, then public consultation
Wānaka · Home of South Island General Aviation

Where South Island
aviation comes home.

Hangars, maintenance, training and a concierge front door. All of it GA-scale, community-shaped, and privately built.

Sources & image credits

Grounded in the record.

Sources: Egis, Wānaka Airport Future Review: Community Engagement Results and Recommendations (Feb 2026) · QLDC covering report & signed minutes, Full Council 19 Mar 2026 · QLDC release "Work begins on Wānaka Airport Master Plan" (25 Sep 2026) · ODT, "Focus on general aviation, flights to Chch 'supported'" · AIANZ Budget 2026 statement · NZ Herald (aviation engineering shortage) · CAA NZ (Part 147; TTMRA; foreign AME licences) · 14 CFR 65.77 · Flying Mag (24 Jul 2023) · QAC SOI FY26–28. Full citations: RESEARCH.md and COMMUNITY-OUTREACH-2Y.md.

Images (Wikimedia Commons): Mt Aspiring aerial, Phillip Capper (CC BY 2.0) · Southern Alps from airplane, Gerda Arendt (CC0) · Mountains west of Lake Wānaka 01 & 03, Krzysztof Golik (CC BY-SA 4.0) · Sunrise over Lake Wānaka, Michal Klajban (CC BY-SA 4.0) · Lake Wānaka, Rod Waddington (CC BY-SA 2.0) · Rob Roy Valley, Pseudopanax (PD) · Matukituki Valley, Steve Collis (CC BY 2.0) · PA-18 Super Cub ZK-BOY, Oren Rozen (CC BY-SA 3.0) · Warbirds display 2014 & Yak-3M, Bernard Spragg (CC0) · Wānaka Airport apron, Alex Proimos (CC BY 2.0) · Engineers working on a Cessna, KamauxKamau (CC BY-SA 4.0), illustrative.

Status: Concept for discussion. Not a QLDC, QAC or Egis document. Egis economic figures are preliminary. "Patey" is cited as a process analogy only; no Patey branding or copy is used.